Slope percentage to degrees calculator
Start from a percentage, an angle or a rise and run: this free calculator gives the slope in all three forms plus its 1:n ratio. Handy reference points: an ADA ramp is 1:12 (8.33%), a 10% road grade is 5.71°, and 100% is 45°, not 90°.
Free, no sign-up, no limit Runs in your browser: your text and files are never sent or saved.
Slope percentage to degrees
Slope
Enter a slope, an angle, or a rise and run to convert it.
Reference slopes
| Reference | Percent | Degrees | Ratio |
|---|---|---|---|
| Accessible ramp, France (standard) | 5% | 2.86° | 1:20 |
| France, tolerated over 2 m max | 8% | 4.57° | 1:12.5 |
| ADA ramp, US (1:12 max) | 8.33% | 4.76° | 1:12 |
| France, tolerated over 0.5 m max | 10% | 5.71° | 1:10 |
| 10% road sign | 10% | 5.71° | 1:10 |
| 45° diagonal | 100% | 45° | 1:1 |
How to use it
- Choose what you know: a percentage, an angle in degrees, or a rise with its run.
- For rise and run, use the same unit for both and say whether the run was measured horizontally or along the slope.
- Read the percentage, the angle and the 1:n ratio. Add a horizontal distance to see how much height it gains, or a height to climb to get the ramp length needed.
Example
Input
Rise of 1 ft over a horizontal run of 12 ft
Output
8.33% · 4.76° · 1:12
Good to know
- 100% is a 45° slope (the rise equals the run), not a vertical wall. A vertical face would be an infinite percentage, so the calculator stops at 89.9°.
- Percent grade is rise ÷ horizontal run × 100. If you measured along the surface of the slope, pick that option: the horizontal run is worked out first, otherwise steep slopes come out too gentle.
- ADA ramps (US) must not be steeper than 1:12 (8.33%), with a rise of no more than 30 in per run. France allows 5%, tolerating 8% over 2 m and 10% over 0.5 m. Check the rules that apply to your project.
- US roof pitch is given as rise per 12 in of run: a 4:12 pitch is 33.33%, or 18.43°. Enter a rise of 4 and a run of 12.
- A 10% road sign means 10 ft of climb for every 100 ft of horizontal distance, about 5.71°.
Slope in percent, degrees and 1:n: the formulas
Percent grade = rise ÷ horizontal run × 100. The angle in degrees is the one whose tangent is that same ratio: degrees = atan(% ÷ 100), and % = tan(degrees) × 100. The ratio 1:n gives the run for one unit of rise, so n = 100 ÷ %.
Common values: 5% = 2.86° = 1:20, 8.33% = 4.76° = 1:12, 10% = 5.71° = 1:10, 20% = 11.31° = 1:5, 50% = 26.57° = 1:2 and 100% = 45° = 1:1. Percent and degrees are not proportional: the steeper the slope, the faster the percentage grows.
Frequently asked questions
How do you convert slope percentage to degrees?
Take the arctangent of the percentage divided by 100: degrees = atan(% ÷ 100). A 10% grade gives atan(0.10) = 5.71°, a 25% grade 14.04°. The other way, % = tan(degrees) × 100. The calculator does both and adds the 1:n ratio.
Is a 100% slope vertical?
No. 100% means the rise equals the horizontal run, which is a 45° angle. A vertical wall would be an infinite percentage, which is why angles above 89.9° cannot be entered. Anything steeper than 45° is more than 100%: 50° is about 119%.
What is 1 degree in percent slope?
1° is about 1.75%. For small angles the relation is almost linear (2° ≈ 3.49%, 3° ≈ 5.24%), but it bends quickly as the slope steepens: 30° is 57.74%, not 52.5%, and 45° is 100%.
How do I find the slope from rise and run?
Divide the rise by the horizontal run and multiply by 100: 2 ft of rise over 40 ft is 5%. Choose “Rise and run” and enter both in the same unit. If you measured along the slope (the length of a board or ramp), choose “Along the slope” so the horizontal run is worked out first.
What is the maximum slope for an ADA ramp?
1:12, or 8.33% (4.76°): one inch of rise for every 12 inches of run, with no more than 30 inches of rise before a landing. Enter a rise of 1 and a run of 12 to see it. Local codes can be stricter, so check the rules that apply to your project.
How do I convert roof pitch to degrees?
Roof pitch is the rise per 12 inches of run: choose “Rise and run”, enter the rise (say 6) and a run of 12. A 4:12 pitch is 33.33% or 18.43°, 6:12 is 50% or 26.57°, and 12:12 is 100% or 45°.